Commercial Project

    Wells Fargo Northstar

    Graham Construction has been working with Wells Fargo in Des Moines since 2012. In July 2017, disaster struck the Wells Fargo Northstar Building as a roof-drain pipe burst on the level of the third floor. Graham was asked to come in to gut and remodel the areas with water damage affecting floors 1-3. The renovation space covered over 80,000 square feet. The project included replacing all ceilings and carpet along with the bottom 2 feet of drywall on all walls.

    The space was shared between Wells Fargo and another leasing tenant. The work was split into three phases; Wells Fargo space, leased tenant space and shared common space. Graham completed all the work in 4 months when all employees were able to return to their work space.

    Category Commercial
    Builder Graham Construction
    Location Des Moines, Iowa
    Project Dates August 2015
    Project Size 80,000 square feet
    Share this Project